Austal Starts Production on 26 Army Landing Craft in $5B Deal

Austal landing craft production has started on two Army projects worth about $5 billion, with metal now cut on the first heavy and medium boats.
By Josua Ferreira -
  • Austal has started building its two Army landing craft projects, worth about $5 billion in total, with metal cut on the first heavy and medium boats.
  • The Landing Craft Heavy contract covers 8 vessels worth about $4 billion, and the Landing Craft Medium contract covers 18 vessels worth $1.029 billion.
  • The heavy craft contract runs through 2038, giving Austal more than a decade of contracted work.
  • Western Australian partners HD Plasma and Pacific Industrial Company made the first cuts, at Bibra Lake and Naval Base.
  • A proposed Austal USA sale of US$1.25 billion to US$1.35 billion would not change Austal's Strategic Shipbuilder appointment in Australia.
Summarise with AI:

Production starts on $5 billion landing craft projects

Austal (ASX: ASB) has commenced production on its $5 billion landing craft projects for the Australian Army, with metal cut on the first Landing Craft Heavy (LCH) and Landing Craft Medium (LCM). The milestone was announced on 11 November 2026.

The start moves the projects from design and planning into physical build for Austal Defence Shipbuilding Australia Pty Ltd, which operates as Australia’s Strategic Shipbuilder. It follows the successful completion of significant design, planning, supply chain mobilisation and workforce readiness activities.

The two contracts at a glance

The LCH contract consists of 8 vessels and the LCM contract consists of 18 vessels. The first metal cuts were performed by Western Australian partners, including Austal’s long-term industry partner Pacific Industrial Company.

The Landing Craft Heavy contract was first announced in February 2026 and runs through 2038, giving the shipbuilder more than a decade of contracted work and a record order book.

Project Vessels Contract value Metal cut by Location
Landing Craft Heavy (LCH) 8 approx. $4 billion HD Plasma Bibra Lake, Western Australia
Landing Craft Medium (LCM) 18 $1.029 billion Pacific Industrial Company Naval Base, Western Australia

CEO view on delivery

Paddy Gregg, Chief Executive Officer

“The start of production on the LCM and LCH projects represents a major step forward in the delivery of littoral capability to Australia’s defence force and reinforces Austal’s ability to deliver complex naval platforms through its world-class shipbuilding facilities in Western Australia.”

Supply chain and sovereign capability

The metal cuts by HD Plasma and Pacific Industrial Company, according to the company, highlight the importance of Austal’s supply chain in the success of the two projects.

Gregg said the two projects will deliver enduring benefits, including:

  • Australia’s sovereign defence industrial capability
  • Skilled jobs
  • Stronger supply chains
  • Long-term certainty for Western Australia’s shipbuilding sector

Gregg also said the projects extend beyond vessel delivery. He described them as “a leap forward in continuous naval shipbuilding in WA, contributing to the long-term sustainability of our naval shipbuilding workforce and supply chain and reinforcing Western Australia’s position as a nationally significant defence manufacturing hub.”

Gavin Stewart, Executive General Manager, Austal Defence Shipbuilding Australia

“The first metal cuts by HD Plasma and Pacific Industrial Company are important milestones that turn years of planning, engineering and preparation into physical production…”

“The commencement of both projects is an incredibly significant achievement for Austal Defence Shipbuilding Australia and the Strategic Shipbuilding Agreement framework under which we operate.”

Why landing craft matter to the Austal story

The LCH and LCM are amphibious projects. Amphibious vessels operate between sea and shore, and the company describes the projects as delivering littoral capability, meaning capability in coastal waters, to Australia’s defence force.

The Strategic Shipbuilder label stems from November 2024, when the Australian Commonwealth Government appointed Austal as its Strategic Shipbuilder for the construction of key Defence vessels in Western Australia.

Austal's Scale and Sovereign Defence Impact

A proposed Austal USA sale, a non-binding offer of US$1.25-1.35 billion, would not alter the Australian Strategic Shipbuilder appointment that underpins these landing craft projects.

For investors tracking the contract book, the two contracts total about $5 billion (8 LCH plus 18 LCM), and production is now underway. Austal is Australia’s largest defence exporter and first ASX-listed shipbuilder, with more than 360 vessels contracted over almost 40 years.

Want Alerts Like This on the Industrials Stocks You Follow?

StockWire X Market Intelligence scores every announcement in our coverage for how significant it’s likely to be for investors, and which way it points, then alerts you on the stocks you follow. The first 1,000 founding members lock in 50% off for life: A$247 a year instead of the standard A$495. Join the founding waitlist today.


Frequently Asked Questions

What is a landing craft?

A landing craft is an amphibious vessel that operates between sea and shore. Austal is building heavy and medium versions for the Australian Army.

How many landing craft is Austal building for the Australian Army?

Austal is building 26 vessels in total: 8 Landing Craft Heavy and 18 Landing Craft Medium. The two contracts are worth about $5 billion.

When did Austal start landing craft production?

Austal announced on 11 November 2026 that metal had been cut on the first Landing Craft Heavy and Landing Craft Medium. The work moves the projects from design and planning into physical build.

What is Austal's Strategic Shipbuilder role?

The Australian Government appointed Austal as its Strategic Shipbuilder in November 2024 to build key Defence vessels in Western Australia. The landing craft projects sit under this role.

Where are the Austal landing craft being built?

The first metal cuts were made in Western Australia. HD Plasma worked at Bibra Lake and Pacific Industrial Company worked at Naval Base.

Josua Ferreira
By Josua Ferreira
Partnership Director
Josua Ferreira holds a Bachelor of Commerce in Marketing and Advertising and brings a background in publication, business development, and ASX market storytelling. He has worked with listed companies across the resource sector and broader market, combining sharp commercial instincts with a genuine commitment to keeping investors informed.
Learn More
Companies Mentioned in Article

Breaking ASX Alerts Direct to Your Inbox

Join +20,000 subscribers receiving alerts.

Join thousands of investors who rely on StockWire X for timely, accurate market intelligence.

About the Publisher